A3 Guildford University Interchange
Our Sister Company Redland Cladding Installation Ltd were chosen to partner Volker Laser Ltd to provide a design and installation solution for cladding a steel piled section along the A3 Guildford Bypass. They installed an all stainless steel backing system consisting of a horizontal and vertical lattice to fix the SureBrick cladding system onto. The SureBrick system gave a perfect brick finish to the piled wall. This work was carried out to Kier Construction and Highways England strict road construction standards.

Bare Piles on Slip Road 
We Fitted Horizontal Rails 
Many Sizes of Brackets 
Top Hats Installed 
SureBrick Rails Installed 
Tiles In The Rails 
Pointed and Capping Added 
Inspection Doors Required 
Hatches Fitted With Tiles 
The Finished Wall 112 Metres Long