A3 Guildford University Interchange
Our Sister Company Redland Cladding Installation Ltd were chosen to partner Volker Laser Ltd to provide a design and installation solution for cladding a steel piled section along the A3 Guildford Bypass. They installed an all stainless steel backing system consisting of a horizontal and vertical lattice to fix the SureBrick cladding system onto. The SureBrick system gave a perfect brick finish to the piled wall. This work was carried out to Kier Construction and Highways England strict road construction standards.
Bare Piles on Slip Road We Fitted Horizontal Rails Many Sizes of Brackets Top Hats Installed SureBrick Rails Installed Tiles In The Rails Pointed and Capping Added Inspection Doors Required Hatches Fitted With Tiles The Finished Wall 112 Metres Long