Portakabin

Portakabin were contracted to build 3 health centres in the Wolverhampton area. Due to planning constraints, the buildings needed to match the surrounding area therefore brick cladding was the chosen product to enhance the Portakabin buildings whilst blending in with the locality where they were installed.

The 3 buildings were over 1000 metres in total area and were installed over a 6 week period. As you can see on the pictures, the build process comprised of installing a metal backing frame structure. We then fixed Wonderwall to the frame and finish point with standard sand and cement mortar mix. 

Brick Panels UK Ltd completed this project from design to installation to pointing.